Right before the installation of the gypsum board in a project, we perform a site inspection together with stakeholders, often known as a ‘box walk’. We’ve recently done this at the Silverton Hospital expansion. During this box walk, we went through the site and collaborated to adjust the positioning of power and data outlets while the walls are still open. This proactive strategy ultimately leads to significant savings in terms of both time and money.
Take a look at the most recent construction photos from the project!